Project Data:

Structure Type

Building Properties

Height from natural ground level to the finished floor level (FFL) -- e.g. a plinth, podium, or pole footing above grade. Leave as 0 if the structure base sits at ground level.
Calculated automatically from eave height and roof geometry -- the average of the eave and ridge/peak heights.